Vis meny

bioWave installed with Cranemaster units

on 18 December 2015

With the use of two large Cranemaster units of 700T and 400T SWL, the wave energy device bioWAVE was recently installed near Port Fairy, Victoria, in rough weather conditions. The two Cranemaster units functioned perfectly, resulting in reduced DAF in the splash zone and reduced landing speed for the large bioWAVE. According to Mr. Kay, CEO of ARENA, this project is a major achievement for Australia’s emerging wave power industry and represents a breakthrough in renewable energy innovation.

Read more about the project:

Biopowersystems.com (Pressrelease and photos of the installation)

Hansaheavylift.com (Pressrelease)